Services

Our Services

This is What We Do Best

Installation of Vinyl/Protrusion Billboard​

Billboard Sizes

Fixing Overhead Bridge

The estimated duration to completed the Over Head Brdige 2 sided 30 days. The OHB size:

Constructing Mass Concreate Footing

Constructing Mass Concreate Footing all types:

Fixing New Unipole V Shape (Pole)

Note: Estimation Duration To Completed

Fix New Unipole V Shape After Footing Is 45days. 

1. Unipole Size: 60′ x 40′ x 110′
2. Completed Unipole Footing.
3. Welding Structure
4. Fixing Panel.

Fixing New Unipole Tower

Note: Estimation Duration To Completed

Fix New Unipole V Shape After Footing Is 45days.

1. Unipole Size: 60′ x 40′ x 110′
2. Completed Unipole Footing.
3. Welding Structure
4. Fixing Panel.

Fixing Minipole 30' X 20'

Estimation duration to completed the minipole 20 days inclunging footing.

Fixing New Fence

All type fence

Fixing New Telco

Estimation duration to install telco 21 days including footing

Safety

Construction safety aims to ensure that a construction site or the industry as a whole is not the cause of immediate danger to the public around a construction site, or the workers at a construction site, as well as making sure that the finished product of construction meets required safety standards.